![]() To complete the base unit, level it, and connect six diagonal braces for every two vertical meters.This should form an X when viewed from above. Fasten a plan brace diagonally in the base frames, and repeat with a second plan brace.Attach a second horizontal brace similarly on the other end of the base frame. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |